Simulated vs Actual Lighting: Why Dialux Designs Drift

Either separate schedules can Frontiers be used for each floor (as shown in Figure 6) or an average for the building can be calculated. Instead, the schedules can take into account uncertainty within the data to understand the effect of variability in the schedules on energy use. A monthly seasonal factor was calculated by taking the average daily maximum number of swipes per month.

Typical weekday and weekend day profiles of energy use were used to compare predicted and measured energy use and understand the hourly variation in energy use, profiles were created for a per year basis. BuroHappold Engineering had no role in study design, data collection, data analysis, decision to publish or preparation of the manuscript. DM is CvD’s first academic supervisor during his doctoral studies and has reviewed the paper and provided feedback for initial revision. CvD, the main author, is a doctoral researcher and is the main contributor to this original research paper. In practice, however, this occurs as increasingly stringent building efficiency targets set by the government or local councils are not being met.

The corridor lighting upgraded was completed in 2014 with microwave sensors, the corridors on the first floor where this study was located have a mixed use of academic offices and centrally bookable classrooms. Equation 1 is extracted from the external consultants calculations used in these corridor lighting upgrade projects and they are based on the Carbon Trust formulae for calculating the business cases for retrofit projects (Carbon Trust, 2012). Two buildings Urban and Maths had upgrades completed by 2013, the financial payback periods for the Humanities lighting upgrade was considered unviable and therefore the decision was made that this building’s corridor lighting would not be upgraded at the time. This will allow for evaluation of the accuracy of the energy efficiency calculations commonly used by energy managers for decision making.

However, it became clear that a large variation exists in occupancy throughout the seasons as MPEB and CH are university buildings where occupancy is affected by university terms or semesters, evident from Figure 4. As such, for performance modeling during design, it is essential to determine future use of spaces, potentially based on previous experience or data from existing buildings. Schedules of use directly affect energy use and can have a large impact on the discrepancy between predicted and measured energy use. In addition, limitations are described that were likely to affect model calibration accuracy, typically due to a lack of information.

The data collected include in-depth 1 min resolution of corridor lighting on time, corridor occupancy, vertical corridor illuminance, and building level electricity metering where available. The key contribution of this work is to measure the performance gap in corridor lighting by taking a retrospective approach and analysing three buildings lighting use by recording actual occupancy and lights on data. There are no indications within the calculations as to why these differences are so large—as previous researchers have pointed out, these assumptions survive unchallenged (Menezes et al., 2012).

Discrepancies between predicted and measured energy use was mitigated through iterative adjustment of building energy model assumptions in four case study buildings. In the case study buildings, the baseloads for equipment in Office 17, 71, CH and MPEB were ~25, 20, 65, 85%, respectively, compared to the NCM assumption of 5.3%. These were a large contributor to a discrepancy between regulatory predictions and measurements as there was a significant difference compared to the typically assumed NCM equipment power baseload.

We ask for the pole drawing, including arm length and setback, before we run any photometric calculation. The use, distribution or reproduction in other forums is permitted, provided the original author(s) and the copyright owner(s) are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. In addition, in certain cases, the profile is normalised to unity (i.e., scaled to bring the values into the range [0,1]).

It is also increasingly used in activities such as commissioning and energy retrofitting scenarios of existing buildings (Fabrizio and Monetti, 2015), as an accurately calibrated model is more reliable in assessing the impact of Energy Conservation Measures (ECMs). Trend analysis, energy audits, and traditional commissioning of systems can highlight poor performing processes in a building. The use, distribution or reproduction in other forums is permitted, provided the original author(s) or licensor are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. Performance gap, lighting, corridors, higher education, decision making, carbon emissions, electricity consumption This can be achieved through following stages 3–5 in the “Lighting Design Process” Figure 1 with regular re-commissioning and dramatically shortening the time delay to switch off. It is proposed that the closer the lights on hours are to the occupancy hours in these buildings, the greater the savings in annual electricity consumption and carbon dioxide emissions.